Permit applications submitted for Wind farm Wieringermeer

On the 9th of September, seven permit applications were submitted for constructing Wind farm Wieringermeer at the municipality of Hollands Kroon. The wind farm, located in the Wieringermeer polder, will consists of 102 wind turbines which will replace individual wind turbines in this area. The wind farm was initiated by Nuon, ECN and Wind collective Wieringermeer, a local collective of farmers and wind-turbine owners.

Pondera Consult prepared the environmental impact assessment and managed the permit application process.

The draft permits will be up for public consultation by the end of this year.

Wieringermeer

 

This entry was posted in News, Newsslider, Uncategorized. Bookmark the permalink. Both comments and trackbacks are currently closed.