Construction of 4 wind turbines to start at Heineken brewery

Pondera Consult prepared the Environmental Impact Assessment and managed the permit application process for the installation of four wind turbines, with a combined installed capacity of 12 MW, at the Heineken brewery in Zoeterwoude. Once operational, the wind turbines will provide up to 40% of the brewery’s energy demand.

Foto3VestasV90 klein

This entry was posted in News. Bookmark the permalink. Trackbacks are closed, but you can post a comment.

Post a Comment

Your email address is never published nor shared. Required fields are marked *

You may use these HTML tags and attributes <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*
*

Please solve the simple sum below *