Monthly Archives: May 2015

Pondera Consult wins EIA tender for Wind Farm Zeewolde

Pondera Consult has been asked by De Ontwikkelvereniging Zeewolde and Windunie to support the entire EIA process for the Rijksinpassingsplan (national zoning plan) and necessary permits required to realise Wind Farm Zeewolde.

In the Zeewolde polder there currently are 220 solitaire wind turbines which will eventually be replaced by Windfarm ... More»

Posted in News, Newsslider | Tagged , | Leave a comment

Final permits and national zoning plan for Wind farm Wieringermeer

The three parties who are jointly developing Wind farm Wieringermeer (Nuon, ECN and Windcollectief Wieringermeer) have received the final permits for the planned 99 wind turbine wind farm in the Wieringermeerpolder.

In addition, the Rijksinpassingsplan (national zoning plan) has also been established. With this step, the wind farm has come ... More»

Posted in News, Newsslider | Tagged , | Leave a comment

Grontmij and Pondera to prepare offshore wind farms

Grontmij and Pondera to prepare one of world’s largest offshore wind farms in the Netherlands

7 May – Grontmij, a listed consulting & engineering company with a strong European presence, and partner Pondera Consult  will carry out preparatory studies for the call for tender by the Dutch Ministry of Economic ... More»

Posted in In the press, Newsslider | Tagged , , , | Leave a comment