Pondera as proud sponsor of Eco-Runner Team Delft attended Design Presentation Eco-Runner XIV

  On February 28, 2024, Eco-Runner Team Delft presented the design of the Eco-Runner XIV. As a proud sponsor of Eco-Runner Team Delft, Pondera attended this presentation.   The Eco-Runner Team Delft is a team of enthusiastic students from Delft University of Technology. Every year they design the most efficient hydrogen-powered car possible. They participate…

Pondera Consult concludes agreement for Wando Geumil Offshore Wind Project in Korea

  Pondera Consult, together with its subcontractors DWT and OutSmart is pleased to have concluded a Sub-Consultancy Agreement with Korean company Yooshin Engineering Corporation for the Wando Geumil Offshore Wind Project in Korea. End client Wando Geumil Offshore Wind Co. (SPC), whose majority shareholder is KOEN (Korea South East Power Co. Ltd.), requested Operations &…

Meet our new Ponderians!

  Pondera welcomes 6 new team members who started in December and in January. With their own knowledge and experience they will strengthen various Pondera teams. All of them are driven to contribute to the energy transition. We are happy to introduce them to you.   Dong Khanh Linh joined Pondera Vietnam as a Renewable…

We have new Ponderians joining us!

  Pondera is growing. In recent months we have welcomed five new colleagues: Leila, Margo, Marieke, Cato and Edo. We would like to introduce them to you below.   Leila Siebke works as a Renewable Energy Consultant in the Technical Team. She is motivated and enjoys contributing to making our planet more habitable. Leila loves working…

Pondera supports Sri Lanka on offshore wind

    Pondera has just started an extensive assignment commissioned by the World Bank to support the Sri Lankan government on offshore wind. According to the recently published roadmap by the World Bank, the South Asian island nation has great potential for offshore wind development. The initial scouting exercise estimates locational potential of about 27…

Pondera expands across the borders

  Our international team continues to expand! In recent months, we have welcomed three new colleagues in our offices abroad: Anneke in Indonesia, Truc in Vietnam and Gertjan in Finland. We would like to introduce them to you. Anneke Julianita works as a business developer in our Jakarta office. Her enthusiasm to accelerate the energy…

Pondera and Rebel Group team-up to study the Just Energy Transition Partnership (JETP) in South Africa and Indonesia

Pondera is proud to announce to have been awarded a project for the Netherlands Ministry of Foreign Affairs. For this project an analysis is conducted and an implementation plan is designed to determine how the Netherlands can best contribute to the implementation of the Just Energy Transition Partnership (JETP) in South Africa and Indonesia. Pondera…

A new office and a new colleague in Jakarta

Pondera in Indonesia recently moved to a new office, and we welcomed another new colleague. Pondera’s team in Indonesia recently moved into a new office. Our new address is:   The CEO Building, 12th floor Jalan TB Simatupang No. 18C Jakarta Selatan 12430 Indonesia    The move to the new office came right in time to…

Main Energy Structure Programme (Programma Energie Hoofdstructuur)

The Netherlands aims to be climate neutral in 2050. This has major consequences for the future energy system. On 3 July 2023, Minister Jetten (Climate and Energy) presented the Nationaal Plan Energiesysteem (National Energy System Plan) and Programma Energiehoofdstructuur (Main Energy Structure Programme). These contain directional choices and the plans for the required space for…

Offshore Wind Power in Indonesia – Study & Conference

  Pondera has been contracted by the EU through the EU Climate Dialogues Project (EUCDs) to study the offshore wind potential in Indonesia and to organize an international conference on just energy transition and offshore wind energy. Close engagement with relevant stakeholders including the Indonesian Government, business community and other actors will be kept throughout…

Solar farm Koegorspolder

  In Koegorspolder, south of Terneuzen, Shell is constructing one of the largest solar parks in the Netherlands. Pondera has been closely involved in the supervision of construction and implementation. For Pondera it is the first project where we provide construction supervision for a solar park only.   The Koegorspolder solar park has a total…

Meet our four new colleagues!

    In recent months we have welcomed four new colleagues to Pondera. We are very happy that they have come to work with us, and would therefore like to introduce you to Rinze, Renee, Eugene and Suzanne. Suzanne Klerx Suzanne has been working at Pondera since May 2023. She supports our branch offices abroad…

Pondera and Etha Wind sign MOU to support each other in the engagement in offshore wind projects on the Finnish offshore and near shore market

From left to right: Bastiaan Bor (Business Developer Pondera), Rae Lescelius (Deputy Head of Mission, Embassy of Finland Copenhagen), Bert van der Lingen (Vice-chairman NWEA), Hans Rijntalder (Chairman Pondera Group), Eric Arends (Vice-chairman Pondera Groep), Arne Brandsma (Deputy Head of Mission Dutch Embassy), Caroline Kullbäck (Etha Wind Managing Director), Marko Ekman (Etha Wind Business Development Director).…

Start of FLS validation campaign

March 8th, 2023, 12.08. Location: Scottish West Coast. One last check of all the safety procedures with the crew, going over the lifting plan and securing the delivery location, and then it’s finally time. Time to cast off the ropes and sail out of the harbor, into the North Sea, at about 4 knots (about…

Change of directors at Pondera Consult

  Martijn ten Klooster succeeds Sergej van de Bilt as director of Pondera Consult as of March 6. Sergej will continue to work within Pondera as senior consultant and partner. Martijn takes over the daily management from Sergej and together with Paul Janssen as deputy director, will form the new management of Pondera Consult. In…

Two new faces at Pondera!

    We proudly welcomed our new colleagues who started with us in January 2023: Joann Smit and Roy van Alst. We are happy to introduce them both to you.   Joann Smit As communications specialist, Joann plays an important role in environmental communication. He is a valuable asset to the Marketing & Communications team.…

Wind farm Noordoostpolder

Wind farm Noordoostpolder, with a capacity of 429 MW, is the largest wind project realized to date in the Netherlands on land and in the water of the IJsselmeer. It actually consists of three projects which together form Windpark Noordoostpolder.   Project manager Location Client Koepel Windenergie Noordoostpolder Country Nederland Start 01/01/2007

N33 Wind farm

Pondera provided the EIA and permit procedure for Yard Energy, Innogy (formerly RWE) and the Ministry of Economic Affairs for the National Coordination Regulation (RCR) Wind Farm N33. On 29 May 2019, the Council of State issued a decision on Wind Farm N33 and concluded that the decision was taken with due care. The Windpark…

Drentse Monden-Oostermoer Wind farm

A group of farmers, united in the Stichting Duurzame Energie Exloërmond, Windpark Oostermoer BV and Raedthuys Windenergie BV (Pure Energie,) have joined forces to jointly develop a large-scale wind farm in the Drenthe Veenkoloniën. Pondera was asked to supervise the procedures for the initiative and to manage the environmental impact assessment for the national integration…

Afsluitdijk-Fryslân Wind farm

Fryslân wind farm is a unique and large-scale wind project in the Ijsselmeer, near Breezanddijk on the Afsluitdijk. The project, with a total of 89 Siemens Gamesa turbines and an installed capacity of 383 MW, is currently under construction. The capacity per turbine is 4.3 MW (SWT-DD-130 wind turbine) with a diameter of 130 metres,…

Nijmegen-Betuwe Wind farm

The Windpower Nijmegen cooperative constructed a wind farm in Nijmegen North, along the A15 motorway. This wind farm consists of 4 wind turbines (a fifth is possible from a planning point of view) and has been supplying electricity since the end of 2016. Pondera guided the initiator and involved authorities from the planning phase to…

WestFrisia Wind farm

Windpark Westfrisia B.V. has a wind farm on the Westfrisiaweg (N302) in the municipality of Medemblik, consisting of five wind turbines developed in 2019. The initiative has a long history and meets the requirements of a so-called transitional arrangement of the Province of Noord-Holland. A Provincial integration plan has therefore been drawn up under the…

Windfarm Zeewolde

Zeewolde development association wants to develop a wind farm of approximately 100 wind turbines with associated civil and electrical facilities in the province of Flevoland. There are currently 220 wind turbines on the outskirts of the municipality of Zeewolde. The remediation of these wind turbines is part of the project. Zeewolde wind farm falls under…

Ampyx Power

Ampyx Power is developing an Airborne Wind Energy system with a PowerPlane, a tethered aircraft that converts wind into electricity. The PowerPlane moves at an altitude of up to 450 metres where the wind is strong and constant. The technology is currently being tested in the Netherlands. Pondera assisted Ampyx in getting the required permits…

Wind farm 15

Park 15 Logistics B.V., Park 15 Business B.V. and Lidl N.V. wish to develop four wind turbines on the Park 15 industrial site, located in the municipality of Overbetuwe. For that purpose, Pondera is preparing an EI assessment, environmental permit application, attempting to obtain an exemption in connection with the Flora and Fauna Act and…

Solar Farm de Grift (Nijmegen, A15)

Along the A15 motorway lies the Nijmegen-Betuwe Wind Farm, developed by the Nijmegen Windpower cooperative. The plan is to build a solar park of approximately 5 hectares at this wind farm, which has been developed with the support of Pondera. With approximately 17,000 solar panels, the park supplies enough sustainable electricity to supply 1,000 households…

Wind farm Green

In southern and eastern Flevoland, the existing solitary wind turbines and existing line arrangements are being re-powered in various subareas. In eastern Flevoland, around Biddinghuizen and Dronten, this subarea is Groen. The various initiators have joined forces in this subarea. The plan consists of one wind setup – almost all local initiators in collaboration with…

Wind farm Staphorst

Bovenwind Wind Farm, also known as Staphorst Wind Farm, consists of 3 wind turbines in the municipality of Staphorst, and has an installed capacity of approximately 12 MW. The developer and owner of the wind farm is the cooperative Wij Duurzaam Staphorst (WDS), which initiated the wind farm in collaboration with the Waterschap Drents Overijsselse…

Wind farm Reusel

Pondera advises the High Tech Agro Campus Association (VHTAC) from the early initiative to the final permits for 11 wind turbines of approx. 4.5 MW south of Reusel and near the Belgian border. The VHTAC only consists of members who live near the wind farm. It is a completely local project and is therefore fully…

Wind farm Oss – Den Bosch

In the Lithse polder in the municipalities of Oss and ‘s-Hertogenbosch, some 80 agricultural companies have planned to set up a large-scale wind farm with an indicative size of approximately 100 MW – 150 MW. Since 2015, the farmers have been working closely together to not only develop a wind farm, but also to distribute…

Energiepark Pottendijk

At one of the wind locations in the municipality of Emmen, a wind farm of 14 wind turbines with an installed capacity of up to 50.5 MW and a solar park of approx. 30 hectares is being developed, collectively called Pottendijk Energy Park. Pondera guided the EIA procedure for the Energy Park and submitted the…

Energy estate Wells Lake

The municipality of Bergen has an ambitious plan to transform the Wells Meer area, near the Maasduinen, into an Energy Estate. This plan is part of a larger program: VerduurSAMEN 2030. This states that the Energy Estate provides 50% of the total energy requirement of the entire municipality, which is 870 terrajoules per year. Pondera…

RES Northeast Brabant

The Climate Agreement sets objectives for shaping the heat transition in the built environment and generatng more renewable electricity on land, specifically wind and solar energy. This is implemented in thirty regional energy strategies (RES), in which municipalities tackle this issue together. Pondera assisted in drawing up this RES for the Northeast Brabant region. It…

Jeju Hanlim

Jeju Hanlim Offshore Wind Co, a project consortium consisting of the companies Kepco Engineering and Construction, Komipo, Dealim and Baram, is developing an offshore wind farm near Jeju Island. Once completed, it will be the third offshore wind project in South Korea with an expected installed capacity of 100 MW. The country has chosen a…

Maasvlakte 2

From 2023, a new wind farm consisting of 20 turbines will be realised on the beach and dykes on the Second Maasvlakte. With over 100 MW of installed capacity, it is the first larger project that has been put on the market via a tender. Preparations for this tender already started around 2013. Eneco won…

‘What’s so appealing about being an entrepreneur? Being able to follow your instincts’

From an early age, Pondera founder Hans Rijntalder knew he wanted to become an entrepreneur. While studying in America, he discovered his passion for the environment and climate. ‘What’s so appealing about being an entrepreneur? Being able to follow your instincts.’ We were in conversation with R ijntalder about the energy supply of the future, Pondera’s new role and the importance of ‘steady but healthy’ growth.

Batteries: earning money based on price fluctuation

An increasing number of companies have one and even more are considering getting one: a battery. With more and more wind turbines and solar panels putting electricity on the grid, it is becoming progressively more challenging to balance supply and demand at every moment of the day. Batteries can provide a solution, but the business case can be complex and problematic, say Jeroen de Veth, Jim Quik and Mark Rijntalder of Pondera Consult.

Introducing our new colleagues!

Our team continues to grow. In recent months we have welcomed five new colleagues: Enriko, Gitte, Floris, Manuela and Linh. Read on to find out about our brand-new Ponderians.   Enriko Weijers Enriko has been the Finance Manager at Pondera since August 2022. During his career so far, he has gained extensive professional experience as…

An impeccable project: opening WP Strekdammen

Together with relations and colleagues we celebrated the opening of Windpark Strekdammen on August 31st. A project that has been realized by Pondera and Rebel in the Eemshaven estuary and consists of the installation of two nearshore GE Cypress 5.5 MW wind turbines. Windturbine supplier: GE Renewable Energy: Foundation supplier: KWS Infra Electrical work supplier: Alsema…

Three new faces at Pondera

Three new colleagues have recently joined the ever-growing Pondera team. Varildo, Mark and Egbert briefly introduce themselves below. Varildo Vaseur Varildo works as a Renewable Energy Advisor within the Contracting, Construction and Operations team. He started his career in Suriname and specialises in solar energy projects. ‘I am really looking forward to taking on new…

Clean energy? Support civil initatives

The energy transition is inevitable, and many people want clean energy. However, local residents may be concerned if a wind turbine is placed in proximity of their homes. Noise and shadow flickering may cause stress and annoyance for some. Prof. Dr. Gundula Hübner researches the social acceptance of renewable energy sources. ‘Everyone experiences the energy…

Hydrogen rather final element than starting point in the energy transition

Offshore wind farms are on the rise. In the next ten years, another 10 gigawatts of capacity will be built in the North Sea, relatively close to the coast. But what happens after 2030? Will we continue to build? Will we be able to use the renewable energy, or will we turn it into hydrogen? We speak to Frans Rooijers and Martha Deen from the research and consultancy firm CE Delft.

Sif Group, representing KCI the engineers, GE Renewable Energy and Pondera sign an MoU for the feasibility study of a Green Hydrogen Centralized Offshore Wind Production Project: AmpHytrite

The AmpHytrite project is aimed at mastering the complexity of a centralized offshore and off-grid hydrogen production unit and is aiming a staged construction and operation of this green hydrogen offshore wind production unit. The ultimate objective of the project would be to contribute to affordable large-scale green hydrogen production at sea, thereby supporting decarbonization…

Pondera’s team continues to grow

Pondera continues to expand, and at the end of March, we welcomed five new colleagues: Mark, Desiree, Jeroen, Sergio and Richelle. Please allow us to introduce them to you. Mark Rijntalder Mark works as a Renewable Energy Consultant in the team Data-analysis and Modelling. As a result of his graduate internships at both Pondera and…

Pondera uses Whiffle’s unique weather prediction technology to advance to the next level of wind flow modelling

Pondera has entered into a license agreement with Whiffle to use Whiffle’s innovative model called GRASP (GPU-resident Atmospheric Simulation Platform). With Whiffle’s GRASP model, Pondera puts itself on the forefront of wind resource modelling. Whiffle’s unique technology involves Graphics Processing Units (GPUs) for running the weather simulations and allows users of the model to perform…

Financial close for Wind farm Bovenwind

At the end of November 2021, Wind farm Bovenwind achieved a financial close and the final notice to proceed was issued to wind turbine manufacturer ENERCON and contractor Van den Heuvel. Partly through the efforts of cooperative Wij Duurzaam Staphorst (WDS) and the water board WDO Delta, and the pleasant cooperation with the ASN Bank,…

Duiven wind turbines contract signed

In late October 2021, the Rijn & IJssel Regional Water Authority signed the delivery and maintenance contracts for two Enercon E-138 EP3 E2 wind turbines. These wind turbines, with a joint installed capacity of 8.4 MW, are due to be installed on the site of the sewage treatment plant on the InnoFase industrial estate in…

Management changes at Pondera Consult

Pondera has been in existence for over 14 years, and in that time it has grown into a flourishing business employing around 70 people in the Netherlands and abroad. The energy transition is associated with many different complex issues. In order to be able to continue to respond to future developments, we have decided to…

A fresh start in a refurbished office

Pondera in Arnhem has undergone a metamorphosis. On 25 October 2021, we moved into the new office next to Arnhem Central Station. The open look, fresh colours and a combination of open and closed work areas provide an inspiring and comfortable working environment. Naturally we have opted for sustainable materials and ergonomic furniture. The concept…

The sewage treatment plant as an energy hub

Pondera is conducting research for the Unie van Waterschappen (Dutch Association of Water Boards) into a sustainable solution to make sewage treatment plants less dependent on the electricity grid. This has led to the idea of a Smart Energy Hub: an electrolyser installed at a sewage treatment plant to produce green hydrogen. Combined with a…

Blog: From energy producer to energy hub

With the energy transition in full swing, the Dutch energy grid is becoming increasingly burdened. As a result, the supply of renewable energy to the grid is limited in some regions which therefore impedes the realisation of new renewable energy projects. This effect is also known as curtailment. To achieve further progress in sustainability, creative…

Blog: The safety of wind turbines

Fortunately it is a rare occurrence, but wind turbines can fail in such ways that they pose a risk to the safety of the surrounding area. Imagine the damage caused by a (part of a) rotor blade breaking off, the tower collapsing or the nacelle falling down. Although incidents almost never occur, research into the…

Reinforcement of the contracting team

Mark van Doorn has been employed by Pondera since 1 May 2021 and works within the CBE team, which is involved in the Contracting, Construction & Exploitation of sustainable energy projects. Mark has been active in the wind industry since 2000 and gained his experience at Lagerwey, Harakosan, XEMC Darwind and the last 7 years…

Start construction Windplan Groen

On 28 May 2021, the construction of Windplan Groen officially started. The first activities were the decommissioning of several existing wind turbines in the area and the construction of the high-voltage substation on the Olsterpad. All wind turbines are expected to be online in 2022. Windplan Groen is an initiative in the southeast of Flevoland,…

Pondera’s Podium: Marjolein Pigge

Pondera is always working hard to take sustainable energy projects a step forward. The Pondera team consists of juniors and seniors who contribute their expertise and knowledge to the energy transition and the use of natural resources. In the series Pondera’s Podium we’ll be putting our Ponderians in the spotlight via a short interview. We…

Pondera in the Top 250 Growth Companies

This week, the Erasmus Centre for Entrepreneurship (ECE) published the Top 250 Growth Companies for the fifth time. This time around Pondera is on the list as one of the 12 growth companies in Gelderland. Justin Jansen, professor of entrepreneurship and academic director of ECE says: “The companies are progressive in developing new solutions, but…

New CBE team leader: Egbert Jansen

On 1 April 2021, Egbert Jansen became team leader of the CBE (Contracting, Construction and Exploitation) team. The CBE team deals with the contracting, construction & exploitation of sustainable energy projects. Egbert succeeds Angelique Strijker who has left Pondera. Egbert has been with Pondera since 2018. Coming from the contracting industry, he felt at home…

Pondera’s energetic challenge

Colleagues at Pondera decided to fight against sitting down all day and motivate each other to clock up as many kilometres as they could for a good cause. The Ponderians have been forced to spend lots of time at home during lockdown. So, to motivate each other to keep moving, we created the 1000-Mile-Challenge. Over…

Blog: ‘The fine print’ of the Environmental and Planning Act (Omgevingswet) for the development of wind farms

‘Need to know’ for wind farm procedure choice On 1 January, 2022, the Environmental and Planning Act (Omgevingswet) will come into force according to the official schedule, although according to news in recent days, it seems to be heading for another postponement… However, as long as that postponement has not yet been formally announced, we…

Pondera and Eneco conclude framework agreement

To formalise the cooperation between Pondera and Eneco and to make it run more smoothly, Pondera has again concluded a framework agreement at the initiative of Eneco. Pondera and Eneco have been working together successfully for several years on various projects, such as Windpark Maasvlakte 2, Windpark Oranjepolder in Oosterhout and Windpark Nieuwe Waterweg. The…

Pondera kicks off in Estonia

Pondera is to start works in Estonia. We will use our expertise in environmental impact assessment for the Saaremaa offshore wind farm. The wind farm is expected to consist of a maximum of 100 turbines with a total capacity of more than 1,000 MW. Preparations for the Saaremaa Offshore Wind Farm started in 2015. In…

The Strekdammen project

At the end of 2020, Pondera and Rebel completed the financing for the Strekdammen Windpark (WPS) with ABN AMRO. Pondera and Rebel are planning to build two GE wind turbines with a total capacity of 11 MW in the estuary of Eemshaven. With the financial close completed, Pondera and Rebel, in collaboration with various stakeholders,…

Offshore wind development in the US

Now that the US has rejoined the Paris  Climate Agreement, offshore wind developers in that country foresee a bright future. In this new era, the US can make a giant leap and become an offshore wind energy forerunner in the foreseeable future. Pondera’s Maarten Jaspers Faijer outlines his vision on this development in his blog…

Pondera welcomes two new Ponderians

In 2021, Pondera will again welcome new colleagues to the team. The brand new Ponderians Frank and Bas started in January. We are certain that they will make a major contribution to the team. We would like to introduce our new colleagues to you: Frank Schellen With more than 10 years of experience in spatial…

Blog: Offshore wind in the US

US Offshore wind take-off In the last few months, a lot has been written on the potential take-off of offshore wind in the United States. Now that the US is ‘back in the game’ and is taking up on climate change by rejoining the Paris agreement, offshore wind developers foresee a bright short term future…

Borssele Offshore grid in focus

Since 2020, the two high-voltage connections Borssele Alpha and Beta have been operational. Borssele offshore grid transports two times 700 MW of wind energy from the Borssele offshore wind energy area to the national high-voltage grid. In this video some nice images are shown of the construction of the two offshore platforms, the offshore cables,…

Strekdammen gradient measurements

In the summer of 2020, Pondera was commissioned to perform a short wind measurement campaign to determine the effect of the existing wind farm Eemshaven on the wind speed. Earlier this year, Pondera Development purchased the right to build 2 wind turbines at the Dutch coastal project called Strekdammen, just to the north of Eemshaven.…

Final permit for Noordermeerdijk solar park

On 23rd November, 2020, the Noordoostpolder Municipality granted the final permit for the Noordermeerdijk solar park in the Noordoostpolder. Pondera and HVC worked together to submit the application for this permit. The solar park covers approximately 50 hectares and has a potential installed capacity of approximately 100 megawatt peak. This solar park will be capable…

ISO certification for Pondera

Pondera is ISO-9001 certified! The certification of the quality management system of Pondera Consult took place on November 18, 2020, in accordance with the guidelines of NEN-EN-ISO 9001: 2015. Our ISO certification extends to research and advice in the field of sustainable energy, climate, spatial planning and the environment. This is how we ensure we…

Blog: The realisation of a geothermal project

Geothermal energy is considered by many to be the ‘new’ source of sustainable energy. Since the drilling of the first geothermal wells in 2007, this technique has become increasingly sophisticated. The adverse effects on the environment are limited, so this energy source can be used to great effect. Geothermal energy is therefore playing a major…

Wind measurements in Indonesia

The Pondera team in Jakarta, led by Chandra Soemitro, recently installed the first LiDAR in Indonesia. Our colleague Maarten Graveland flew to Indonesia especially for the purpose of supporting the team in Jakarta with the installation of the LiDAR. In Maarten’s blog, you can see that this installation is slightly different than in the Netherlands.…

New branch office in Seoul

On September 1st 2020, Pondera’s new branch office was launched in Seoul in Korea, one of the most targeted countries in renewable energy. The company will serve Korean clients as a consulting and investment company in the field of renewable energy with a focus on offshore wind energy projects. Pondera has provided the specialised European…

Groen Wind Plan is irrevocable

On 16th September, the Council of State issued its decision on the integration plan and permits for the Groen Wind Plan. As a result of the decision, the integration plan and the permits are irrevocable and the wind plan can be built. Pondera congratulates the initiators united in Windkoepel Groen on this result. This decision…

windopland

Pondera, CE Delft and BRO are working on the Energy Main Structure Program

In collaboration with CE Delft, BRO and Pondera will carry out the integrated effects analysis (IEA) for the Energy Main Structure Program (PEH) under the EIA / RIP framework agreement. The effect analysis was commissioned by the Ministry of Economic Affairs and Climate and in collaboration with the Ministry of the Interior and Kingdom Relations and the Ministry of Infrastructure and Water Management.

Certificate for Haliade-X 12 MW

In June 2020, GE announced that the Haliade-X 12 MW received a provisional type certificate from DNV-GL. This makes it the most powerful turbine in the world, a step closer to full type certification. This is the ‘IECRE Provisional RNA Component Certificate’, which demonstrates that GE’s Haliade-X prototype meets the highest safety and quality standards.…