GE’s Haliade-X 12 MW to be installed in Rotterdam

  • Agreement signed with Future Wind includes five years of testing and 15 years of service
  • Installation of Haliade-X 12 MW will take place during summer 2019

GE Renewable Energy and Future Wind (a Joint Venture between Pondera Development and SIF Holding Netherlands) announced today that they have signed an agreement to install the first Haliade-X 12 MW wind turbine prototype in Maasvlakte-Rotterdam (NL) during summer 2019. The deal includes five years of testing and a 15-year full service Operation and Maintenance agreement.This Haliade-X 12 MW prototype will be installed onshore to facilitate access for testing. During the initial period of operations, it will allow GE Renewable Energy to collect data needed to obtain a Type Certificate, a key step in commercializing the product in 2021.Activities in Rotterdam to prepare the site for future installation have just begun. The nacelle of the Haliade-X 12MW prototype will be assembled in Saint-Nazaire (France), while the three 107 meter-long LM Wind Power blades will be manufactured in Cherbourg (France), and the tower sections will be produced in Seville (Spain). All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.This prototype in Rotterdam is part of the $400 (€320) million investment in the Haliade-X development announced by GE Renewable Energy in March 2018 to help reduce offshore wind’s cost of energy in order to make it a more competitive source of clean, renewable energy.

Pondera Consult supports this project with the following services:

  • Permits
  • Subsidy
  • Contract Management (Delivery, Maintenance and PPA)
  • Grid Connection
  • Operations and Asset Management